日本丰满白嫩BBWBBW_日韩无码一区_欧洲精品码一区二区三区免费看_欧美日韩精品亚洲综合中文一区_午夜福利不卡片在线播放 _国产欧美一区二区三区精品蜜桃_免费毛片一区二区三区久久久_国产精品欧美复古日韩经典在线

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


余庆县| 道孚县| 陇西县| 阿图什市| 巫山县| 松原市| 隆昌县| 延寿县| 兴义市| 木里| 鸡西市| 新郑市| 黄石市| 会东县| 白朗县| 腾冲县| 安龙县| 横山县| 兴文县| 宁化县| 鸡东县| 民和| 贞丰县| 清流县| 西安市| 新邵县| 桐庐县| 元江| 安乡县| 乌拉特后旗| 隆安县| 军事| 政和县| 西乡县| 铁力市| 上栗县| 福泉市| 太白县| 盐池县| 紫云| 怀仁县|